Precision Floor Installation · Staten Island & NYC

Level subfloors. Razor-tight seams.

Great flooring starts underneath what you see. We inspect moisture, level uneven joists or concrete slabs, lay acoustic/waterproof underlayment, and install solid hardwood, wide-plank engineered oak, custom herringbone or luxury vinyl plank with architectural transitions.

Typical duration: 2 – 5 days5.0 ★ · 117 Google Reviews
Matte white oak floor installed in a sunlit NYC high-rise residence
02White oak installation in NYC high-rise

What's included

Craftsmanship
checklist.

  1. 01

    Complete demo & disposal of old carpet, buckled wood or outdated tile

  2. 02

    Subfloor leveling, plywood replacement & acoustic/moisture barrier underlayment

  3. 03

    Solid 3/4-inch hardwood, wide-plank engineered oak, herringbone & luxury vinyl plank (LVP)

  4. 04

    Custom flush stair nosings, baseboards, shoe molding & doorway transitions

  5. 05

    Seamless lacing and color-matching into existing adjacent hardwood rooms

Free written quote

Let's measure
your space.

Tell James & Moe about your floors, walls or renovation. Same-day replies, seven days a week from 8 AM to 6 PM.

01 · Select service
02 · Approximate size
900 sq ft·Typical timeline: 2 – 3 days

Text us from your phone

(718) 801-1480

Email us instead

[email protected]